How Long Does It Take to Build a Custom Pool in Dallas?
Dallas pool builder
Average Timeline for Building a Custom Pool in Dallas
If you’re considering building a custom pool in your backyard, one of your first questions might be: “How long will it take to build my pool?” As a trusted Dallas pool builder, Hobert Pools is committed to delivering a top-quality pool tailored to your unique vision. From the initial consultation to the final inspection, we ensure that your pool-building experience is as smooth and enjoyable as possible.
Here’s a detailed breakdown of the typical pool-building timeline and the factors that can influence it.
- Initial Consultation & Design Phase (1-3 Weeks)
The process begins with an initial consultation to discuss your vision for the pool, including design preferences, features, and any special requirements. As an experienced Dallas pool company, we know that the design phase is critical to bringing your dream pool to life. Depending on how intricate the design is and how quickly decisions are made, this phase typically takes 1 to 3 weeks. - Permitting & Approvals (2-4 Weeks)
Once the design is finalized, the next step is obtaining the necessary permits from local Dallas authorities. The permitting process can vary based on your location and local regulations, but it generally takes 2 to 4 weeks. During this time, we’ll also schedule inspections to ensure that the pool construction complies with Dallas city codes. - Excavation & Structural Work (1-2 Weeks)
Once permits are approved, the excavation begins. This phase involves preparing your property for pool construction by digging the site. As a custom pool builder in Dallas, we are experienced in handling various soil conditions and other challenges that might arise. This stage typically takes 1 to 2 weeks, depending on the pool’s size and complexity. - Plumbing Steel Installation (1-2 Weeks)
After excavation, we move on to installing the plumbing steel, which is essential for your pool’s structure and functionality. This phase ensures that your plumbing system is set up correctly to accommodate features such as pumps and filters. Plumbing steel installation typically takes 1 to 2 weeks. - Gunite or Concrete Application (1 Week)
For most of our custom pools, we use gunite or concrete to build the pool shell. Gunite pools are a popular choice among Dallas pool builders because of their durability and design flexibility. Once applied, the shell requires a week to cure, ensuring a solid foundation for your pool. - Electrical and Gas Plumbing Installation (1 Week)
Following the gunite application, we proceed with installing electrical and gas plumbing systems, including pumps, filters, and lighting. Whether you’re adding water features or spa jets, this stage ensures your custom pool is fully functional and ready to impress. This typically takes about a week. - Tiling, Coping & Decking (2-3 Weeks)
With the structure and plumbing in place, the next phase focuses on tiling, coping, and adding decking around your pool. This is where your Dallas custom pool truly begins to take shape. Depending on the complexity of your chosen design, this phase can take 2 to 3 weeks, transforming your pool area into a stunning outdoor living space. - Finishing Touches (1 Week)
Once the primary construction is finished, we move on to the finishing touches. This includes plastering the pool’s interior, filling it with water, and testing all the equipment to ensure everything is functioning perfectly. Landscaping and other final details can also be added at this stage, which typically takes about 1 week. - Pool Completion & Final Inspection (1 Week)
After construction is complete, we perform a final inspection to make sure everything meets code and your satisfaction. As a leading Dallas pool contractor, Hobert Pools is dedicated to ensuring every part of your custom pool is up to the highest standards. This final stage takes around 1 week, after which you’re ready to enjoy your brand-new pool!
What Can Affect the Pool Construction Timeline?
While the typical timeline for building a custom pool is 8 to 12 weeks, several factors can cause delays:
- Weather Conditions: Rain or extreme heat can delay construction, particularly during excavation and structural work.
- Design Complexity: More intricate pool designs with custom features like spas, waterfalls, or specialized lighting may require additional time.
- Permitting Delays: While we aim to expedite the permitting process, some areas of Dallas may take longer than expected for approvals.
- Material Availability: Supply chain issues or delays in material deliveries may impact the construction schedule, but we always work to minimize such disruptions.
Build Your Dream Pool with Hobert Pools